            高低壓成套設備安裝需要注意哪些事項?

            發布時間:2023-07-24 來源:http://www.landmann.cn/ 瀏覽量:

            1.安裝時,配電柜應按照施工圖的布置順序放置在基礎鋼筋上。單獨的機柜可調節機柜表面和側面的垂直度整個問題可以通過添加墊片來解決,但不超過三個墊片,并且焊接牢固。放置一排機柜中的每個單元后,調整PDC的水平度和面板偏差。應進行調整以滿足施工規范的要求。
            During installation, the distribution cabinet should be placed on the foundation steel bars in the order shown in the construction drawings. The verticality of the surface and sides of the individual cabinet can be adjusted. The entire problem can be solved by adding gaskets, but not more than three gaskets, and the welding is firm. After placing each unit in a row of cabinets, adjust the levelness and panel deviation of the PDC. Adjustments should be made to meet the requirements of construction specifications.
            2,安裝應嵌入盒子中,安裝面板應與墻壁齊平;壁掛式配電柜可以通過膨脹螺栓固定在墻上,但空心磚或燕尾螺栓應預埋在砌塊墻上或用方頭螺栓固定。調整PDC后,在PDC主體上安裝螺栓并擰緊鋼筋。
            2. The installation should be embedded in the box, and the installation panel should be flush with the wall; Wall mounted distribution cabinet can be fixed on the wall by expansion bolt, but Concrete masonry unit or dovetail bolt shall be embedded on the block wall or fixed by square head bolt. After adjusting the PDC, install bolts on the PDC body and tighten the steel bars.
            3.高低壓成套裝置接地注意事項如下:每個PDC都連接到基礎鋼上。銅電纜可用于將PDC中的PE排連接到接地螺栓。根據連接情況,必須添加彈簧墊圈以防止松動。每個柜門應使用銅編織線牢固地連接到PE排。
            濟南機箱機柜
            3. The grounding precautions for the high and low voltage complete equipment are as follows: each PDC is connected to the foundation steel. Copper cables can be used to connect the PE busbar in the PDC to the grounding bolt. According to the connection situation, spring washers must be added to prevent loosening. Each cabinet door should be securely connected to the PE busbar using copper braided wire.
            4.將配電柜頂部連接到母線上,并注意按要求擰緊母線配套扳手,接觸面應涂上中性凡士林。在配電柜之間連接母線時,注意母線是否離其他設備或外殼太近,并注意正確的相位。
            4. Connect the top of the power distribution cabinet to the bus, and pay attention to tightening the bus matching wrench as required. The contact surface should be coated with neutral Vaseline. When connecting busbars between distribution cabinets, pay attention to whether the busbars are too close to other equipment or enclosures, and pay attention to the correct phase.
            5.控制線校準后,將每條芯線形成一個圓圈,并用鍍鋅螺釘、吊環和彈簧墊將其連接到每個接線板上。通常,條帶的每側各有一根,每個端子有一根電線,再Z兩根電線,然后在兩根電線之間加一個吊環。多股電線應鍍錫,不得斷裂。
            After the control wire is calibrated, form a circle for each core wire and connect it to each terminal block using galvanized screws, lifting rings, and spring pads. Usually, there is one wire on each side of the strip, one wire at each terminal, and then two wires, and a lifting ring is added between the two wires. Multiple wires should be tinned and not broken.
            6、控制電路檢查:檢查電路是否因運輸等因素而松動,并擰緊,檢查電氣元件是否損壞。
            6. Control circuit inspection: Check whether the circuit is loose due to transportation and other factors, tighten it, and check whether the electrical components are damaged.
            首頁首頁 產品產品 電話電話 置頂置頂
            主站蜘蛛池模板: 九色91精品最新在线| 免费国产人成网站x8x8| 亚洲爆乳成av人在线视菜奈实| 欧美高潮喷水大叫| 国产亚洲精品在av| 成人网站在线进入爽爽爽| 色偷偷女人的天堂亚洲网| 性虎精品无码AV导航| 中文字幕无码人妻aaa片| 亚洲伊人色综合www962| 国产成人8X人网站视频| 中文字幕欧美人妻精品一区| 99re66在线观看精品免费| 精品999日本久久久影院| 国产一区二区三区导航| 国产乱人伦精品一区二区在线观看| 国产偷窥熟女高潮精品视频| 国产成人久久久精品二区三区| 成人av专区精品无码国产| 久久婷婷五月综合色国产免费观看 | 精品国产一卡2卡3卡4卡新区| 成人啪精品视频网站午夜| 日韩人妻熟女中文字幕a美景之屋| 国色天香社区视频手机免费 | 牲交欧美兽交欧美| 国产在线视精品在一区二区 | 精品偷自拍另类精品在线| 国产高潮国产高潮久久久| 久久中文字幕人妻丝袜| 爱性久久久久久久久| 全午夜免费一级毛片| 天堂网在线最新版www中文| 国产91小视频在线观看| 欧美丝袜高跟鞋一区二区| 亚洲综合无码精品一区二区三区| 又爽又黄无遮拦成人网站| 国产免费久久精品99reswag| 性欧美欧美巨大69| 最新高清中文字幕免费mv| 精品人妻少妇嫩草av专区| 欧美性猛交xxxx黑人|